WHO WE ARE

Kunin Technologies is revolutionizing the critical mineral supply chain by implementing advanced separation technologies to capture value from overlooked resources.

Metals are everywhere, in solar panels, smartphones, electric vehicles, but as ore grades plummet globally, traditional extraction methods are failing. China dominates critical minerals markets by developing superior separation technologies that extract value from materials American mines discard as waste.

Utilizing Kunin Technologies' breakthrough performance, ion-exchange media significantly more value can be produced from each resource, reducing waste, and unlocking metal abundance.

To achieve metal abundance, humanity must bring separation science down its own Moore’s Law: fix the idiot cost index for micro and nano scale separation materials. This requires mass manufacturing novel ion-exchange media form factors which previously struggled from high costs.

THE ROLE

Group 14 metals (germanium, tin, silicon) are critical materials of the data center build-out, and Kunin is designing, guaranteeing and commissioning a group 14 metal chlorination plant overseas for an industrial partner: metal-bearing feeds from the partner's own process are converted by chlorination, purification and hydrolysis to an electronic-grade metal product, with Kunin's proprietary ion-exchange media recovering the metal from the dilute process liquors. Bench and mini-pilot process development runs in Chattanooga from December 2026 to May 2027, basic engineering issues in May 2027, the plant is built from modular skids in parallel with civil works, and commercial operation is targeted for the first quarter of 2028. The plant is built and operated by our partner; Kunin owns the process, the design package, the performance guarantee and the training of the operating team.

You own delivery of that plant: scope, schedule, cost and quality from the basic engineering package through mechanical completion, commissioning, the performance test and handover to the partner's operating team. You report to the CEO and work alongside the VP of Engineering, who owns the process design, and the partner's site team, who build and operate. You select and manage the partner-country engineering contractor and the skid fabricator, run the Class 3 capital estimate the partner's board approves, and hold the integrated schedule that ties process development, engineering, fabrication, civil works, training and commissioning to a Q1 2028 commercial operation date.

You build the capital projects function from the first hire: project controls, document control, contractor management, FAT and site acceptance, and the project review cadence with the partner. This is the first of a series of Kunin-designed metal recovery and conversion plants. You are a founding member of Kunin's Capital Projects team, whose goal is 100 critical metal projects in 10 years. Once this plant is through its gates you are expected to be executing design and delivery work on two to three projects in parallel. You build and lead that team.

By 21 May 2027 we expect the basic engineering package and Class 3 estimate issued and long-lead orders released. By 31 December 2027, mechanical completion. By 17 March 2028, a passed performance test and commercial operation.

RESPONSIBILITIES

QUALIFICATIONS AND PREFERRED SKILLS

ADDITIONAL REQUIREMENTS